ASBURY PARK HOTEL
Laurenco Waterproofing some of America’s most recognized landmarks and protecting their historic significance for years to come.
PROJECT DETAILS
Location
Completion Date
Industry
Project Type
Systems Used
Applicator
Architect/Engineer
PRODUCTS USED
The CHALLENGE
A temporary roof was needed to allow interior work to begin to construct the indoor/outdoor gathering area.
The SOLUTION
On the 5th floor, Laurenco SPC was applied as temporary roof to dry-in allowing interior work to begin. Adhered Insulation and coverboard — First layer of insulation adhered in Laurenco Adhesive. 2-layer Laurenco Waterproofing System followed by Laurenco Premium Protection Sheet. All exposed flashings and penetrations waterproofed with Laurenco PMMA Overburden = XGRASS Superlawn Xtreme Synthetic Turf.
On the 8th floor, Laurenco SPC applied as temporary roof to dry-in allowing interior work to begin. Adhered Insulation and Coverboard, first layer of insulation adhered in Laurenco Adhesive. 2-layer Laurenco Waterproofing System followed by Laurenco SPC or G-Cap. All exposed flashings and penetrations waterproofed with Laurenco PMMA Overburden = Elevated steel grating system with 2’ x 2’ x 2” pavers.